Construction of 477.00 meter long (11×42.68m) PC Girder Bridge (Balipara Bridge) over the old Brahammaputra river at 13th km. of Trisal-Nandial-Tarail Road under Mymensingh Road Division during the year 2007-2008.
Description of Works
Bridge Length=477.00m(11x42.68m)
Width of the Bridge = 10.250m
Total Span = 11 Nos.
Navigation Clearance Height = 11.89m
Division-1: General and site facilities = Tk. 11,11,600/-
Division-2: Earth works = Tk. 1,53,23,978.40
Division-3: Pavement works = Tk. 2,06,96,977.50
Division-4: Foundations Works :
a. 750mm dia pile quantity = 40 Nos., Pile length = 28m
b. 1000mm dia pile quantity = 130 Nos., Pile length = 21 to 25m
= Tk. 11,20,07,350.00
Division-5: Structure works :
a. PC Girder quantity = 55 Nos., Length 42.68m = Tk: 23,68,06,062.24
Division-6: Incidental = Tk. 1,31,52,169.80